Blocks getting varnished, in privileged position on board Aramoana. Mainsheet blocks, embossed with Armistice Day commemorative coins (as a nod to original lead ballast’s contribution to the war effort).
Boom/ballooner mast bands with offset pin rails, mast hoops below (temporarily, obviously).
Uroxsysation of spars (L to R: topsail yard, ballooner pole, jack yard, gaff, boom) complete.
Foreground L to R: swim ladder; cut-down cabin sole for ring frame; navigation light boxes.
Forepeak complete.
To trickle-charge batteries at mooring, proposed hard frame solar panel: don’t think so. Better option: fold out canvas mat, and at 200W. Genius. Packs away to nothing.
Speaking of genius, once it became evident a forepeak cot berth was not achievable, Andy Ball’s suggestion to repurpose inflatable fenders spanning benches. They are remarkably rigid, easily supporting this body’s weight without sagging.