Preparing deck furniture

Recoat cockpit seats with Uroxsys, sand and repeat to give six coats to the tops and two to the bottoms. Five coats to cleats.

Dismantle skylight. Glue, screw and bung centre rail together; cut bead into lower edge. Sand and seal frames, leaves, case and centrerail. Denib and coat with Uroxsys. Sand and recoat to give four coats to all, except centre rail (two coats).

IMG_1201 IMGP1246 IMGP1247 IMGP1248 IMGP1250 IMGP1251 IMG_1219 IMGP1252 IMGP1253 IMGP1254 IMGP1255 IMGP1256