Collect, rip, and machine timber; set up lamination jig and glue up deckbeams; clean up and trim all beams.
Collect nuts and washers from Barclay Engineering. Paint undersides of floors with two coats of topcoat. Carefully remove sidedecks. Remove chainplates and padeyes. Remove all foredeck hardware.
Remove foredeck. Plane plank ends flush with sheer clamp top and remove red lead. Trim back stem top and drifts.