Lockdown 6

At Level 3, things really start to come together.

Reinstated original koru terminating coveline.
Aft coveline termination is Morse Code for R(ogue).

Castings are back from foundry for machining. (Patterns here; drawings here.)

Mainsheet Murray winch bases, cast to fit around cockpit coaming, and spreader
Boom and gaff goosenecks, to be integrated with pinrail on mast

And the interior! Matt Price’s exacting cabinetmaking is absolutely on song.

I’m only slightly traumatised by the need for an antislip finish to the floorboards and companionway steps. Still, better than breaking my back.

Leave a comment